This facility maintained full activity while renovations were underway on this existing space. Before performing construction, three obstacles struck the Andrews team with a strong control over dust, noise reduction, and keeping all electrical data systems functional. With computers and technical equipment located throughout the facility, dust control was highly stressed. Since the facility maintained normal operation, noise control was a high priority, as well as keeping their electrical and communication systems online at all times.